# Identify process improvements that can be rolled into the manufacturing transfer without changing the design and impacting the existing regulatory status for the device e.g. instead of hand mixing pigment to resin use a pre-mixer to control quality of mixing and resulting extrusion or perform the molding and over-molding steps in 1 machine instead of 2 separate molding machines.
 
== Phase 3: Post-acquisition integration ==
=== Deadlines ===
* Goal: Switch production transparently to new facilities transparently to the distribution scheme
 
# Design center integration plan
#* Gap analysis completion (acquiree)
#* Gap analysis completion (acquirer)
# Design to manufacturing transfer
# Equipment transfer
#* Milestone payment
# Shut production at acquiree facility
#* Milestone payment
#* Negotiation: contract extension
# Start production in acquirer facility
# Switch to new SKU
# End development of new generation product/s
# Restart development of new generation product/s post-acquisition