Changes

Ureteral Stent

449 bytes added, 00:25, 5 August 2008
/* Review components */
|-
!rowspan="3"|Product Performance Specifications (PPS)
| Design inputs correlate adequately to the specifications; DV&V (design verification and validation) criteria are based on risk management documentation or if the criteria are based on sound statistical sampling plans
|
# Compare product specifications to design inputs
| Risk Analysis, Design Failure Modes and Effects Analysis (DFMEA), Process FMEA, other risk management documentation
|
# Is Check whether documentation is available?# Does Check whether it adhere adheres to appropriate ISO 14971 standards?# Does Check whether it adhere adheres to appropriate client standards?
|rowspan="4"| Quality systems
|-
| DFMEA links appropriately to the PPS
|
# Verify whether DFMEA and product specifications are correlated
|-
| Appropriate DV&V reports and design output documents are reference referenced correctly as risk mitigation activities in the DFMEA
|
# Validate the process and correlate with design inputs
# Validate the ranges that sizes used are within range of risk mitigation criteria
|-
| PFMEA links appropriately to the process validation protocol acceptance criteria; In-process inspection procedures and/or manufacturing procedures are recorded as appropriate risk mitigation activities in the PFMEA
|
# Validate the process protocol
# Validate the inspection procedures used
|-
!rowspan="2"|Design Output Documents
|
# Check the entire equipment-related lifecycle
# Was Check if machine operational qualification was performed?# Was Check if the measurement equipment was validated?
|-
!rowspan="2"|Validation Report
| DV&V reports, Shelf-life reports, Biocompatibility test reports, Sterilization reports, Packaging Validation reports, Process Validation Reports
|
# Ensure all reports are available and linked together appropriately# Identify all inconsistencies across different reports
| rowspan="2"|
|-
| Design test methods and related test method validations
|
# Compare test methods used to those in client and ISO standards
# Identify inconsistencies across test methods
|-
|}