Changes

Ureteral Stent

71 bytes removed, 07:26, 4 August 2008
/* Review components */
# Verify the Bill of Materials corresponds to raw materials and manufacturing procedures
# Correlate incoming and in-process inspection procedures with the process specifications
| rowspan="4"| Material science, manufacturing engineering, quality systems
|-
| Linkage between component and raw material specifications and appropriate incoming inspection procedures
|
#
| Material science, quality systems
|-
|-
|
# Review supplier audit reports for compliance
| Manufacturing engineering, quality systems
|-
| Calibration records and preventive maintenance records; in-process / incoming inspection test methods and related test method validations
# Was machine operational qualification performed?
# Was the measurement equipment validated?
|
|-
!rowspan="2"|Validation Report