Changes

Ureteral Stent

365 bytes added, 05:04, 4 August 2008
/* Review components */
|-
!rowspan="4"|Manufacturing Documents
| Manufacturing procedures, component specifications, raw material specifications, in-coming incoming and in-process inspection procedures for completeness|
|
# Verify the Bill of Materials corresponds to raw materials and manufacturing procedures
# Correlate incoming and in-process inspection procedures with the process specifications
| Material science, manufacturing engineering, quality systems
|-
| Linkage between component and raw material specifications and appropriate incoming inspection procedures
|
# |Material science, quality systems
|-
|-
| Inspection procedures have adequate sampling plans based on PFMEA risk mitigation levels – this includes packaging and labeling materials
|
# Review supplier audit reports for compliance|Manufacturing engineering, quality systems
|-
| calibration Calibration records and preventive maintenance records; in-process / incoming inspection test methods and related test method validations
|
|