Changes

Ureteral Stent

160 bytes added, 04:58, 4 August 2008
/* Review components */
| Completeness of drawings
|
# Check if the CAD diagrams overlay and "fit" perfectly.# Check tolerance stackups| Mechanical engineeringQuality systems, CAD
|-
| Correlate First Article Inspection for data to the dimensions on the drawings
|
# Obtain First Article Inspection data# Check if this data correlates with the completeness of drawings|Quality systems, CAD
|-
!rowspan="4"|Manufacturing Documents
| Manufacturing procedures, component specifications, raw material specifications, in-coming and in-process inspection procedures for completeness
|
|
|-
| Linkage between component and raw material specifications and appropriate incoming inspection procedures