Changes

Quality of Service on CDMA platforms

21 bytes removed, 18:06, 2 July 2006
/* QoS Management using Optimal Power Control Pathway */
The Mobile Station(MS) performs Matching of Traffic Descriptors such as Peak Cell Rate(PRC),Sustainable Cell Rate(SCR) and obtains the connection parameters like average cell rate, SIR, Delay from them. These parameters are sent to the Base Station(BS) where they are queued in a FIFO. The BS determines a spreading factor which allocates the Orthogonal Varible Spread code(OVSF) using '''Gi = W / Ri''',where W=system bandwidth which is a constant for a system and Ri= data rate of radio frame.<br> The base station calculates a value of power index '''gi= (vi / (vi+Gi))'''and hence Power levels and transmits them to the MS. This information is conveyed to the MS using TPC(Transmission Power Control) bits and a closed loop power control method as explained in section 5.6 above is performed to obtain the final value of power at which transmission should be done.The method and algorithm to schedule optimal power using Dynamic Resource Scheduling is detailed in the IEEE paper 765366 [[Media:IEEEGurbuz.pdf|Dynamic Resource Scheduling for Variable QoS Traffic in W-CDMA - Ozgur Gurbuz, Henry Owen]].
===QoS Management using Optimal Power Control Pathway===
The Base Station receives a Pilot Signal from the Mobile station and calculates BER based on Distance,Transmission rate and No of Users in the Cell. Ptk is the transmitted signal power which is expressed by the power control function g ( rt , k ), a function of the distance from the mobile to
base station,
Anonymous user